Ohne-Makler.net
Exposé drucken
This listing has been automatically translated.

Planned multifunctional hall for logistics, production and fulfillment - completion 09/2025

Maria-von-Linden Straße 9, 45665 Recklinghausen – Nordrhein-Westfalen
on request
Cold rent (plus additional costs)
Private offer
production / warehouse / commercial hall
production

Ideally suited for e-commerce, logistics companies and the manufacturing industry. The planned warehouse and production hall is scheduled for completion in August/September 2026. An extension to the existing main building is currently being planned, which will expand it by around 1,027 m². The main building is currently used by an e-commerce company as warehouse and office space.

The project is currently in the planning application phase, with approval expected in December 2025.

The hall has a planned average height of 9.75 m, whereby the usable storage height is limited to 7.50 m as there is no sprinkler system. In addition, the hall can be equipped with a crane runway system if required, which makes it particularly attractive for companies from the manufacturing industry.

It is currently still possible to influence the design of the hall in order to take specific requirements into account. The location is ideal for e-commerce companies and logistics service providers thanks to its modern infrastructure and flexible usage options. The hall is accessible both at ground level and via a loading ramp, which ensures optimal access.

ATTENTION!
Your rental agreement can be subsidized as part of an RWP material cost subsidy, which would result in a considerable reduction in the monthly rent.
The prerequisite would be that at least 10% (at least three) additional jobs are created at this location within 36 months.

We can provide you with the relevant information.

Are you interested in this offer?

Object Number
OM-317860
Object Class
production / warehouse / commercial hall
Object Type
production
Handover from
Aug. 1, 2025

Rent & additional costs

Cold rent
on request (plus additional costs)

Details

Condition
first occupancy
Level
ground floor
Total area
1025 m²
Warehouse/Production area
1025 m²
Heating
central heating
Year of construction
2025

Information on equipment

Heating type: heat pump / underfloor heating.

Location

The industrial estate on Maria-von-Linden-Straße in Recklinghausen is an important business location in the region. It is located in the southern part of the city and offers excellent transport connections as it is in close proximity to the A43 highway. This makes the business park attractive for both local and national companies that need to transport their goods and services quickly and efficiently.

Location Check

Sport
600m
Natur
250m
Mobilität
250m
Medizin
Restaurants
250m
Einkaufen
350m
Kultur
Nachtleben

Energy

Energy certificate type
not legally required
Main energy source
air/water heat

PDF

Miscellaneous

Broker inquiries not welcome! According to § 7 UWG, unsolicited contact by brokers without the express consent of the recipient is prohibited!

Send a message directly to the landlord

Questions about the object? Show interest or arrange a viewing appointment?

Click here to send a message to the provider:

Offer from: Rudolf Ring